ReportGem ReportGem 中文

REAL-TIME GLOBAL RESEARCH

Shree Cement: 1Q: volumes up, but so are costs – overall miss

Published: 2026-08-02Institution: JPMorganPages: 13Original language: EnglishEvidence page: 1

Research evidence excerpt

Shree Cement: 1Q: volumes up, but so are costs – overall miss

J P M O R G A N Asia Pacific Equity Research

03 August 2026

Shree Cement Underweight

SHCM.NS, SRCM IN

1Q: volumes up, but so are costs – overall miss Price (31 Jul 26):Rs26,055.00

Price Target (Mar-27):Rs21,500.00

SRCM reported 1QFY27 standalone EBITDA of Rs.10.7bn, missing JPMe of Head of India Research

ACc.Rs.12bn. Headline volumes of 10.2MT (up 17% YoY) were strong, as Sanjay Mookim

anticipated. Realizations increased QoQ in line with peers. The miss was on (91-22) 6157-3600

account of a sharp increase in power and fuel costs (sharper than peers). Overall sanjay.mookim@jpmorgan.com

EBITDA/MT of Rs.1,050 declined from Rs.1,160 in 4QFY26. Management Atishy Rathi, CFA

suggested a) much of the cost increase was one-off, driven by a reduction in (9122) 6157-3589

petcoke / gypsum supplies, b) the use of locally sourced coal changed production atishy.rathi@jpmchase.com

J.P. Morgan India Private Limited, J.P. Morgan

characteristics, forcing increased sales to non-trade, c) the company remains Tower, Santacruz(E), Mumbai - 400098, SEBI

focused on ‘value over volume’ and will look to reduce costs / regain trade share Registration: INH000001873, (91-22) 6157-3000.

as the situation normalizes. The SRCM stock has outperformed the market over the

last two months – likely in anticipation of the strong volume recovery. The earnings

Style Exposure

miss could cause a near-term reversal. Maintain U/W.

• Miss on EBITDA and PAT: SRCM reported EBITDA of Rs.10.7bn, below

JPMe of c.Rs.12bn and consensus of Rs.11.3bn. Depreciation was lower than

expected (down 8% QoQ), but other income was also lower than we forecast

(flat YoY). A high overall tax rate of 31% meant overall PAT of Rs.4.4bn

missed JPM estimates of Rs.5.3bn.

The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.

Open report viewer