实时全球研报
Shree Cement: 1Q: volumes up, but so are costs – overall miss
研报英文原文证据摘录
Shree Cement: 1Q: volumes up, but so are costs – overall miss
J P M O R G A N Asia Pacific Equity Research
03 August 2026
Shree Cement Underweight
SHCM.NS, SRCM IN
1Q: volumes up, but so are costs – overall miss Price (31 Jul 26):Rs26,055.00
Price Target (Mar-27):Rs21,500.00
SRCM reported 1QFY27 standalone EBITDA of Rs.10.7bn, missing JPMe of Head of India Research
ACc.Rs.12bn. Headline volumes of 10.2MT (up 17% YoY) were strong, as Sanjay Mookim
anticipated. Realizations increased QoQ in line with peers. The miss was on (91-22) 6157-3600
account of a sharp increase in power and fuel costs (sharper than peers). Overall sanjay.mookim@jpmorgan.com
EBITDA/MT of Rs.1,050 declined from Rs.1,160 in 4QFY26. Management Atishy Rathi, CFA
suggested a) much of the cost increase was one-off, driven by a reduction in (9122) 6157-3589
petcoke / gypsum supplies, b) the use of locally sourced coal changed production atishy.rathi@jpmchase.com
J.P. Morgan India Private Limited, J.P. Morgan
characteristics, forcing increased sales to non-trade, c) the company remains Tower, Santacruz(E), Mumbai - 400098, SEBI
focused on ‘value over volume’ and will look to reduce costs / regain trade share Registration: INH000001873, (91-22) 6157-3000.
as the situation normalizes. The SRCM stock has outperformed the market over the
last two months – likely in anticipation of the strong volume recovery. The earnings
Style Exposure
miss could cause a near-term reversal. Maintain U/W.
• Miss on EBITDA and PAT: SRCM reported EBITDA of Rs.10.7bn, below
JPMe of c.Rs.12bn and consensus of Rs.11.3bn. Depreciation was lower than
expected (down 8% QoQ), but other income was also lower than we forecast
(flat YoY). A high overall tax rate of 31% meant overall PAT of Rs.4.4bn
missed JPM estimates of Rs.5.3bn.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器