North America Diversified Utilities: ERCOT Solution to Potential Data Center Voltage Issue Advancing

Published: 2026-06-17Institution: CitiPages: 9Original language: EnglishEvidence page: 1

Research evidence excerpt

North America Diversified Utilities: ERCOT Solution to Potential Data Center Voltage Issue Advancing

Flash |

17 Jun 2026 01:54:26 ET │ 9 pages

North America Diversified Utilities

ERCOT Solution to Potential Data Center Voltage Issue Advancing

CITI’S TAKE

Following our Texas power field trip last (link), a few ERCOT power traders

and former Texas regulators raised a concern about data center and

crypto voltage management in Texas with the upcoming large load

buildout as another potential issue. In this note, we discuss ERCOT’s plan

to address this concern without the need for large Texas battery buildout. Ryan LevineAC

Two weeks ago, ERCOT approved a rule that requires large computational +1-212-816-6555

load to remain connected during specific frequency and voltage ryan.levine@citi.com

disturbances and to not disconnect. We expect this rule to be approved by

Amber Zhao

PUCT on July 9.

+1-212-816-0644

amber.zhao@citi.com

ERCOT Moving Beyond Registration and Studies: In our view, NOGRR282

represents a notable evolution in ERCOT’s approach to large-load oversight. Previous

initiatives focused on registration requirements, telemetry, and interconnection

studies. NOGRR282 goes a step further by establishing mandatory ride-through

standards that govern how future large computational loads electrically perform

during grid disturbances.

Reliability Focused Proposal: ERCOT argues the rule is necessary to prevent large

data centers from simultaneously tripping offline during transmission disturbances,

which could contribute to frequency instability and broader reliability concerns as

large-load penetration increases. ERCOT has cited numerous historical load-loss

events and continues to highlight growing large-load requests across the ERCOT