实时全球研报
North America Diversified Utilities: ERCOT Solution to Potential Data Center Voltage Issue Advancing
研报英文原文证据摘录
North America Diversified Utilities: ERCOT Solution to Potential Data Center Voltage Issue Advancing
Flash |
17 Jun 2026 01:54:26 ET │ 9 pages
North America Diversified Utilities
ERCOT Solution to Potential Data Center Voltage Issue Advancing
CITI’S TAKE
Following our Texas power field trip last (link), a few ERCOT power traders
and former Texas regulators raised a concern about data center and
crypto voltage management in Texas with the upcoming large load
buildout as another potential issue. In this note, we discuss ERCOT’s plan
to address this concern without the need for large Texas battery buildout. Ryan LevineAC
Two weeks ago, ERCOT approved a rule that requires large computational +1-212-816-6555
load to remain connected during specific frequency and voltage ryan.levine@citi.com
disturbances and to not disconnect. We expect this rule to be approved by
Amber Zhao
PUCT on July 9.
+1-212-816-0644
amber.zhao@citi.com
ERCOT Moving Beyond Registration and Studies: In our view, NOGRR282
represents a notable evolution in ERCOT’s approach to large-load oversight. Previous
initiatives focused on registration requirements, telemetry, and interconnection
studies. NOGRR282 goes a step further by establishing mandatory ride-through
standards that govern how future large computational loads electrically perform
during grid disturbances.
Reliability Focused Proposal: ERCOT argues the rule is necessary to prevent large
data centers from simultaneously tripping offline during transmission disturbances,
which could contribute to frequency instability and broader reliability concerns as
large-load penetration increases. ERCOT has cited numerous historical load-loss
events and continues to highlight growing large-load requests across the ERCOT
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。