Industry Overview
A 100+ GW opening for on-site power generation 08 July 2026
We believe the US could face an electricity generation shortfall of 100+ gigawatts (GW) Equity
between 2026-30. Our analysis combines the BofA semiconductor team’s chip forecasts Americas
with recent trends in US demand. The result suggests 230+ GW of capacity demand. Industrials/Multi-Industry
This is well above the BofA US utilities team’s forecast for ~93 GW of accredited supply Andrew Obin
from regulated utilities. With demand well above supply, we see the gap being filled Research Analyst
through a combination of on-site power generation, working existing on-grid assets BofAS+1 646 855 1817
longer, adding batteries, and demand destruction. Within our coverage, we view Buy- andrew.obin@bofa.com
rated GE Vernova (GEV), Eaton (ETN), Emerson (EMR), and INNIO (INIO) as beneficiaries. Vivek Arya
Research Analyst
BofAS
+1 646 855 1755Semis forecast implies a surge in US electricity demand...
vivek.arya@bofa.com
BofA’s global semiconductor team recently raised its forecast for data center-related
Ross Fowler, CFA
chip volumes through 2030 (see their Watts to Tokens report here). This includes a Research Analyst
bottom-up analysis of demand across both merchant and custom chips (e.g., Amazon BofAS
+1 646 855 1506
Web Services’ Trainium). Their global chip forecast would drive 208 gigawatts (GW) of ross.fowler@bofa.com
global IT load over 2026-30. North America has approximately half of existing data David Ridley-Lane, CFA
center installed base, suggesting over 100+ GW of load growth from data centers alone. Research Analyst BofAS