Thungela Resources Ltd (TGAJ.J): 1H26 production softer vs Citi/consensus; guidance maintained; portfolio optimization positive in our view
研报英文原文证据摘录
Thungela Resources Ltd (TGAJ.J): 1H26 production softer vs Citi/consensus; guidance maintained; portfolio optimization positive in our view
Flash |
30 Jun 2026 04:24:15 ET │ 11 pages
Thungela Resources Ltd (TGAJ.J)
1H26 production softer vs CitiE/consensus; guidance maintained;
portfolio optimization positive in our view
CITI’S TAKE Buy
Thungela released an operational update for 1H26e today. Thermal coal Price (29 Jun 26 17:00) R99.50
export saleable production is expected to increase by +4% y/y to 8.3Mt Target price R250.00
(1H25: 7.9Mt), lower vs CitiE (8.7 Mt) and VA consensus (8.6Mt). y/y
Expected share price return 151.3% increase was primarily due to lower base as Thungela faced challenging
geological conditions at Ensham mine in 1H25. Production from South Expected dividend yield 30.2%
Africa is likely to decline by -2% y/y (temporary challenges at Zibulo mine) Expected total return 181.4%
while production from Australia is likely to increase by 25% y/y. FOB cost Market Cap R13,979M
is likely to be above guidance range at SA ops while below guidance range US$845M
for Australian ops (exchange rate and consolidation benefit). The weaker
production vs CitiE was driven by lower-than-expected production at
South African operations. Guidance maintained and now implies c9% h/h
increase in 2H (based on mid-point of the guidance). In line vs the higher Ephrem RaviAC
production export increased by c6% in line vs our estimates. +44-20-7986-2462
ephrem.ravi@citi.com
Portfolio optimisation in South Africa- positive in our view — TGA sold the Shashi Shekhar, CFA
Kleinkopje mining right at Khwezela mine continue to progress the sale of Goedehoop +91-22-4277-5028
North. This transaction will result in a reduction of the environmental provisions of shashi.shekhar@citi.com