普通外文研报
Musashi Seimitsu Industry: Japan Summit 2026: Establishing an HSC Supply System
研报英文原文证据摘录
Musashi Seimitsu Industry: Japan Summit 2026: Establishing an HSC Supply System
Update
May 22, 2026 01:56 AM GMT
Morgan Stanley MUFG Securities Co., Ltd.+MMusashi Seimitsu Industry (7220) | Japan Shinji Kakiuchi
Equity Analyst
Japan Summit 2026: Shinji.Kakiuchi@morganstanleymufg.comHayato Takashima +81 3 6836-5416
Research Associate
Hayato.Takashima@morganstanleymufg.com +81 3 6836-5414
Establishing an HSC Supply
System
Below, we summarize the company’s comments at investor meetings held at our
Musashi Seimitsu Industry (7220.T, 7220 JT)
Japan Summit 2026. Strong level of inquires on HSCs: The company is seeing a
Auto Parts | Japan
strong level of inquiries for peak-shaving applications in 800V high-voltage server
Stock Rating Equal-weight
racks (with direct deliveries to Delta Electronics and others). The new Minami Alps Industry View In-Line
plant is scheduled to begin operations in early 2027, and the company plans to Price target ¥4,500
Shr price, close (May 21, 2026) ¥5,180
progressively raise equipment capacity. It plans to increase annual production Mkt cap, curr, basic (bn) ¥339.6
capacity from 200,000 cells to 6.5mn cells by end-Mar 2028 (1.5mn cells at existing Avg daily trading value (bn) ¥3.0
plants plus 5mn at the new plant). Revised plans to introduce a new process in the
predoping step: The cell voltage of its HSCs is 3.8V, giving them an advantage over
competing EDLCs at 2.8V. It raises cell voltage by using lithium predoping in the
negative electrode. The company had aimed to introduce a new production method
that would raise predoping productivity tenfold, but durability and other issues
remain, so it has revised its plan and will now use the conventional method at the
new Minami Alps plant instead (pushing back the start-up by several months). The
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器