普通外文研报
Paladin Energy Limited margin for safety? Assume coverage at Underweight
研报英文原文证据摘录
Paladin Energy Limited margin for safety? Assume coverage at Underweight
Australia Limited/ J.P.
management to guide conservatively and note pressures from higher diesel Morgan India Private Limited
costs (10-15% of cost base) from Jun/Jul along with deferred TSF capex from Zane Guo
FY26. Our unit cost estimate reflects a marginal reduction in absolute (61-3) 9633-4020
production costs vs 4Q FY26 (i.e. first quarter of full mining) with pressure zane.guo@jpmorgan.com
J.P. Morgan Securities Australia Limited
from higher diesel pricing offset by improved grades. We see an opportunity
to include some lower grade stockpiled ore in the feed to reduce material
movements in a high diesel price environment. Paladin is FCF neutral in FY27 Key Changes (FYE Jun)
under our base case (JPMe US$87/lb vs spot US$86/lb). Prev Cur Δ
Adj. net income - 26E ($ mn) 5 (10)-286.1%
• Is the PLS timeline optimistic? We think so. Paladin is working towards final Adj. net income - 27E ($ mn) 100 29 -71.0%
permitting by end-CY27 and a three-year construction schedule. Provincial
permits were granted in Feb-26 with Paladin progressing Federal CNSC Half Yearly Forecasts (FYE Jun)
licensing. We see potential timeline risk, noting ongoing opposition from the Adj. net income ($ mn)
Metis Nation (appeal launched on 31-Mar). While full Indigenous support is 2025A 2026E 2027E
H1 (5) 1A 13
not a pre-requisite, we note NexGen’s Federal approval took c.2.5-years (with H2 (20) (11) 16
full support). We are also aware of numerous projects globally that have been FY (25) (10) 29
delayed due to Indigenous opposition. We incorporate a 12-month delay and
Style Exposure
20% capex increase in our base case (c.A$0.75/sh NPV impact).
• Where could we be wrong? Langer Heinrich continues to outperform
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器