REAL-TIME GLOBAL RESEARCH
Kumamoto Prefecture Hit by Earthquake with a Maximum Seismic Intensity of 7
Research evidence excerpt
Kumamoto Prefecture Hit by Earthquake with a Maximum Seismic Intensity of 7
Update
July 29, 2026 01:30 AM GMT
Morgan Stanley MUFG Securities Co., Ltd.+MAuto Parts & Tires | Japan Shinji Kakiuchi
Equity Analyst
Kumamoto Prefecture Hit by Shinji.Kakiuchi@morganstanleymufg.comHayato Takashima +81 3 6836-5416
Hayato.Takashima@morganstanleymufg.com +81 3 6836-5414
Earthquake with a Maximum
Seismic Intensity of 7
On July 28, an earthquake with a maximum seismic intensity (shindo) of 7 on the
Auto Parts
Japanese scale hit Kumamoto Prefecture. At present, there have been no
Japan
announcements from the auto parts and tire companies under our coverage Industry View In-Line
regarding any impact on factory operations or other activities. Kumamoto Prefecture
is home to production sites for Aisin (body parts, engine parts), Bridgestone
(automotive hoses, high-pressure hoses), Nifco (plastic parts), and TS Tech
(motorcycle seats), among others, as well as a plant operated by JASM, a subsidiary
of TSMC in which Denso has an approximately 5.5% stake. Even if these sites have
not suffered direct damage, attention should be paid to any impact on parts
companies’ operations if supply-chain disruptions (e.g., interruptions to logistics or
energy, or production stoppages at other suppliers) affect production at vehicle and
motorcycle plants. When an earthquake with a maximum seismic intensity of 7 hit
Kumamoto Prefecture on April 14, 2016, Aisin subsidiary Aisin Kyushu suffered
damage to equipment and substation facilities, and alternative production
arrangements were made. Production resumed in late August, and the impact of the
earthquake on F3/17 earnings (including equipment damage and restoration costs, as
well as the impact of production stoppages and cost of alternative production)
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.
Open report viewer