REAL-TIME GLOBAL RESEARCH
Xylem: Mixed 2Q Results; Electric Meter Delays Offset by Data Center and Chemical Wins
Research evidence excerpt
Xylem: Mixed 2Q Results; Electric Meter Delays Offset by Data Center and Chemical Wins
J P M O R G A N North America Equity Research
28 July 2026
Xylem Neutral
XYL, XYL US
Mixed 2Q Results; Electric Meter Delays Offset by Data Price (27 Jul 26):$120.16
Center and Chemical Wins ▲Price Target (Dec-27):$137.00 Prior (Dec-26):$130.00
XYL delivered a mixed 2Q print, with revenue modestly ahead and EPS roughly
in line. FY26 EPS guidance was raised on slightly lower revenue guidance owing Clean Energy, Power Infrastructure,
and Sustainable Investingto Electric metering delays in MCS. Water Infrastructure was the clear standout on
margins, posting expansion well ahead of expectations, while MCS and WSS both Michael G Fairbanks AC
missed on margins. Orders were a bright spot, as expected, with book-to-bill of (1-212) 622-4908
michael.fairbanks@jpmchase.com
~1.3x and backlog building to a record level. Management's tone shifted notably
constructive on the data center and AI ecosystem opportunity compared to prior Mark Strouse, CFA
(1-212) 622-8244
calls, with water framed as an increasingly strategic input across semiconductors, mark.w.strouse@jpmorgan.com
power, and mining. Electric metering delays should continue to be a watch point
Anna Zhu
into 2027, as the business will likely continue to have tough y/y comps, in our (1-212) 622-0012
view. We are updating our model to reflect the results, introducing FY28 estimates, anna.zhu@jpmorgan.com
and establishing a YE27 price target of $137 (vs. a prior YE26 price target of $130). J.P. Morgan Securities LLC
Maintain Neutral.
Quarterly Forecasts (FYE Dec)
• Mixed print; EPS guidance raised. Revenue came in modestly ahead of the Adj. EPS ($)
Street across most segments, with Applied Water the largest upside surprise 2025A 2026E 2027E
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.
Open report viewer