REAL-TIME GLOBAL RESEARCH
Kumba Iron Ore 1H26 results: in line
Research evidence excerpt
Kumba Iron Ore 1H26 results: in line
Update
July 28, 2026 05:46 AM GMT
RMB Morgan Stanley Proprietary Limited+MKumba Iron Ore | Europe Brian Morgan
Equity Analyst
1H26 results: in line Brian.Morgan3@rmbmorganstanley.comChristopher Nicholson +27 11 587-0803
Equity Strategist and Analyst
Christopher.Nicholson@rmbmorganstanley.com +27 11 587-0816
AlphaSignals Earnings Reaction
Kumba Iron Ore (KIOJ.J, KIO SJ)
Unchanged In-line Largely unchanged
EEMEA - Metals & Mining | South Africa
Impact to our thesis Financial results versus consensus Direction of next 12-month
consensus EPS Stock Rating Equal-weight
Source: Company data, Morgan Stanley Research Industry View In-Line
Price target ZAc 28,000
Shr price, close (Jul 24, 2026) ZAc 26,143
Key Takeaways 52-WeekMkt cap, currRange(mn) ZAc 39,531-ZAR 84,45624,751
Net debt (12/26e) (mn)* ZAR (8,489)
FCF ahead of MSe on lower capex (timing) which drives a beat on DPS EV, curr (mn)* ZAR 86,517
UHDMS project largely on track * = GAAP or approximated based on GAAP
Well guided result with EPS and EBITDA in guidance ranges. Kumba has declared
a dividend of R7.50/s, above MSe and below consensus. FCF beat our estimates with
capex coming in about R1b below (FCF drives our DPS calculation).
Sishen unit costs came in above MSe, explaining the miss in EBITDA against our
estimates, together with lower price realisations.
Some minor timing and capex shifts for the UHDMS project, but largely tracking
as planned. The main changes to the UHDMS project relate to capex phasing and a
modest schedule delay, rather than any change to the overall project scope or total
capital cost. Kumba stated that the 2026 expansion capex requirement for UHDMS
has increased to R3.0–R3.2 billion, reflecting the introduction of an additional work
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.
Open report viewer