REAL-TIME GLOBAL RESEARCH
Philippine Power: Geothermal-heavy EDC attracts US$7bn EV bid; potential buyers apart from Barito
Research evidence excerpt
Philippine Power: Geothermal-heavy EDC attracts US$7bn EV bid; potential buyers apart from Barito
J P M O R G A N Asia Pacific Equity Research
15 July 2026
Philippine Power
Geothermal-heavy EDC attracts US$7bn EV bid;
potential buyers apart from Barito
Indonesia's PT Barito Renewables (BREN IJ) has made an unsolicited, non-binding Power
ACoffer to acquire an undisclosed stake in Energy Development Corp. (EDC, Unlisted) Jelline Gaza, CFA
at US$5bn equity value and US$7bn EV (link), as confirmed by parent First Gen (63-2) 8878-1131
(FGEN PM, NC) (link). The news follows earlier reports of a possible divestment of jelline.gaza@jpmchase.com
a 47.5% stake in EDC by Philippines Renewable Energy Holdings (PHREC), a JV J.P. Morgan Securities Philippines, Inc.
between GIC and Macquarie Infra (link, link). EDC, a pure-play renewable genco, Jeanette Yutan
operates the Philippines' largest geothermal portfolio with 1,544MW in total (63-2) 8878-1188
jeanette.g.yutan@jpmorgan.com
attributable capacity, 1,303MW of which is geothermal. The offer implies a US J.P. Morgan Securities Philippines, Inc.
$4.5mn EV/MW, 13-50% above the US$3-4mn/MW replacement cost for
Arnanto Januri
geothermal and 2.3x the implied Php135.8bn equity valuation from PHREC’s tender (622-1) 5291 8047
offer in 2017 (link). Among domestic gencos, we believe potential contending arnanto.januri@jpmorgan.com
bidders could be: (1) the Razon Group (Prime Infra), given its recent partnerships PT J.P. Morgan Sekuritas Indonesia
with EDC’s parent First Gen (FGEN PM, Non-Covered) in natgas and pumped hydro
storage; and (2) Meralco, given its strong cash generation, market share headroom
(6% currently), and EDC's potential to add scale with the planned infusion of MGen
RE assets into SPNEC (link).
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.
Open report viewer