ReportGem ReportGem 中文

REAL-TIME GLOBAL RESEARCH

Catalyst Metals: Risks more than priced in and potential upside is significant; initiate at Overweight

Published: 2026-07-10Institution: JPMorganPages: 32Original language: EnglishEvidence page: 1

Research evidence excerpt

Catalyst Metals: Risks more than priced in and potential upside is significant; initiate at Overweight

mines (Plutonic Main, Morgan India Private Limited

Plutonic East, K2, Trident), growing to 5 in CY27 as Old Highway is Zane Guo

developed. JPMe forecasts 5yr avg production of ~150koz (peak 160koz) at (61-3) 9633-4020

AISC ~A$3,100/oz, deliberately conservative vs CYL's 183koz avg / zane.guo@jpmorgan.com

200kozpa peak at ~A$2,300/oz, which leaves material potential upside if they J.P. Morgan Securities Australia Limited

deliver (NAV ~A$14/sh on company guidance). Little capex is required to add

the 100koz: ~A$100m (JPMe: ~A$170m), or ~A$2,800/oz of incremental Half Yearly Forecasts (FYE Jun)

capacity (~A$170/60koz uplift), roughly half of mid-cap peer CMM's ~A Adjusted PAT (A$ mn)

$5,900/oz for a similar expansion. Mgmt estimates ~50-70% of the capital is 2025A 2026E 2027E

already sunk (A$50m); the remaining build (JPMe: Q4FY26/27/28 at A$16m/ H1 42 109A 121

H2 64 131 146

A$60m/A$45m) is self-funded, with net cash building to ~A$900m by FY29 FY 106 240 267

and A$1.4b if CYL delivers on their plan - which we think the market

underappreciates.

• Plutonic Belt and execution risk. Plutonic is geologically difficult (mostly

UG, nuggety, hard to model). Our ~25% discount to the 200koz target is a

deliberate haircut to throughput (~1.9Mtpa vs the ~2.2Mtpa 200koz implies)

and grade (~2.9 vs ~3.3g/t), not a view that the ounces aren't there; on mgmt's

framing the constraint is development of Trident decline (costing ~A$2m/

month for the next 9 months) and ramp timing, rather than a resource or grade

problem. The mill has had crusher and liner upgrades and mgmt expects it to

run above its 2Mtpa nameplate, but we want to see ~2.2Mtpa sustained before

Contents

crediting it.

The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.

Open report viewer