Electri-Friday: Speed, Scale, and the Q2 Setup
Research evidence excerpt
Electri-Friday: Speed, Scale, and the Q2 Setup
2029 PJM BRA. PJM's 2028/2029 Base Residual
Auction (BRA) results are expected after market close on July 14, and we expect the
headline clearing price to land near the top of the FERC-approved collar at approximately
$335/MW-day. While the capped clearing price is likely to remain relatively stable, the key
variable remains the uncapped clearing price (U-Cap), which the firm believes will provide
the clearest signal on the underlying supply-demand balance. An uncapped clearing price
above roughly $600/MW-day would reinforce the view that demand continues to outpace
supply and would likely be supportive of merchant PJM generators, particularly Talen,
Constellation, NRG, and PSEG. The report also highlights PJM's recent heat wave, which
drove peak demand near record levels and spot power prices above $2,500/MWh, as further
evidence of tightening resource adequacy. In parallel, Evercore expects PJM's upcoming
Section 205 filings on Reliability Backstop Procurement (RBP) and Connect & Manage
(C&M) to emphasize state-led implementation and preserve additional pathways for new
generation development, which remains constructive for long-term IPP fundamentals.
◼ EROC: A Potential (Turn)key to A Bridge (Solution) Found Under An ERock: Initiating
Coverage at Outperform. Evercore initiated coverage of ERock (EROC) with an
Outperform rating and a $28 price target, citing the company's differentiated modular natural
gas "bridge-to-flex" power solution as a compelling way to address accelerating AI-driven
power demand and prolonged grid interconnection timelines. The firm expects ERock's
installed base to expand from approximately 1 GW today to more than 9 GW by 2030,