LTR reported 4Q26 spodumene production of ~103kt of spodumene (@5.0%; ~86kt Hugo Nicolaci
+61(2)9321-8323 |
SC6), in-line with expectations and up ~7% QoQ, with sales catching up on the last Q, hugo.nicolaci@gs.com
Goldman Sachs Australia Pty Ltd
where unit operating costs were broadly flat QoQ at A$995/t (FOB; A$1,194/t SC6),
Paul Young
above GSe, with AISC at A$1,314/t (A$1,577/t SC6) also above. Realised pricing +61(2)9321-8302 |
improved more moderately QoQ to US$1,880/t SC6 impacted by a greater weighting paul.young1@gs.comGoldman Sachs Australia Pty Ltd
to chemicals prices. Combined this broadly saw FY26 guidance met. Marcus Dosanjh
+61(2)9321-8780 |
However, FY27 guidance was below prior expectations, with production of marcus.dosanjh@gs.comGoldman Sachs Australia Pty Ltd
390-440kt below market expectations of ~470kt, with UG mining rates flat into 1Q
at ~1.5Mtpa and a largely linear run rate to the unchanged FY27 exit rate at
~2.8Mtpa (including some early North West Flats). We expect spodumene
production be fairly evenly distributed throughout the year, with most of the
remaining stockpiles drawn down in 1Q (at lower recovery), before increased UG
mine feed QoQ sees an uplift in recovery over the rest of the year at lower
throughput with the UG mine largely the constraint (4Q impacted by ~10 days tie
ins on the long-lead ball mill pre-ordered in Apr-26 to support future expansion).
While the production guidance is below the previously implied offtake volumes