实时全球研报
Semiconductor packaging industry update
研报英文原文证据摘录
Semiconductor packaging industry update
Global Markets Research
Semiconductor packaging industry update 28 July 2026
EQUITY: JAPAN ELECTRONIC PARTS
Research Analysts
We revise assumptions for accelerator roadmaps Japan electronic parts
Manabu Akizuki - NSC
We assume ongoing 2-die GPU configuration, look to earlier EMIB-T manabu.akizuki@nomura.com
shipments for 4-die custom ASIC configurations +81 3 6703 1185
Apr–Jun industry developments: Start of shipments for Rubin processors
We think shipments of packages for Nvidia's Rubin GPUs got under way in 27/3 Q1. We
expect full-scale mass production in Q2. Using macroeconomic statistics, we estimate
monthly shipment value of ¥24.7bn in Jan–Mar and ¥25.8bn in Apr–May (¥28.1bn in
May). The price per m² increased from ¥1.18mn in Jan–Mar to ¥12.9bn in Apr–May
(¥13.6bn in May; Figure 1).
We revise accelerator roadmap assumptions: 2-die configuration for GPUs, earlier
shipments of EMIB-T
There is a growing view in the packaging industry that the structure of the Rubin Ultra will
be changed from four dies, which was announced at GTC in March, to two (see our 30
June 2026 Quick Note SemiAnalysisreportonRubinUltra), and some observers are
starting to take the view that the Feynman will have a two-module structure with two dies
in a 3D stacking configuration. It may have become technically difficult to combine
interposers larger than the 5.5x reticle size with HBM4, which has a lot of wiring. We have
revised our forecasts for Ibiden [4062] (Buy), with a downward revision for our 28/3
forecast for GPU package prices on the assumption that Rubin Ultra will use a 2-die
configuration, contrasted with our new view that shipments of packages for EMIB-T will
begin in 28/3, one year earlier than we previously thought.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器