Rio Tinto Limited: 2Q26 First Take: Solid overall, working cap build but C1 copper cost guide lowered
研报英文原文证据摘录
Rio Tinto Limited: 2Q26 First Take: Solid overall, working cap build but C1 copper cost guide lowered
J P M O R G A N Asia Pacific Equity Research
15 July 2026
Rio Tinto Limited Overweight
RIO.AX, RIO AU
2Q26 First Take: Solid overall, working cap build but C1 Price (14 Jul 26):A$163.61
copper cost guide lowered Price Target (Jun-27):A$209.00
Key takeaways: 1) Pilbara shipments/production were a 5%/7% miss to JPMe
(albeit our forecasts were optimistic) and realised price was $1.2/wmt below JPMe
at $85.3/wmt - we expect the market to view iron ore outcomes as broadly in line.
2) Copper was in line vs JPMe and C1 unit cost guidance has been reduced on
higher gold price/productivity improvements. 3) On the cash balance heading
into 1H results, the $443m OT tax payment, and ~$1.2bn H1 working capital
outflow point to higher consensus net debt revisions. Overall, a relatively solid Australia
result, in our view. ME cost pressures appear contained at this stage. RIO is OW
Head of Australia Metals & Mining
rated.
Lyndon Fagan AC
• Key positives. Copper C1 net unit cost guidance was reduced to US30-50c/lb (61-2) 9003-8648
from US65-75c/lb due to higher gold prices and productivity improvements. lyndon.fagan@jpmorgan.com
J.P. Morgan Securities Australia Limited
• Key negatives. Pilbara iron ore shipments of 85.3Mt were a 5% miss vs JPMe Jonathon Sharp
89.8Mt albeit we had expected some sprint capacity to be utilised in the (61 2) 9003-8312
quarter. Realized revenue of $84.1/wmt is below JPMe $85.3/wmt. jonathon.sharp@jpmorgan.com
• Guidance. All volume guidance is unchanged; copper C1 net unit cost Metals & Mining
guidance was reduced on higher gold prices and productivity improvements.
Diesel is a flagged headwind (~US$0.8/t YoY impact in H1; ~US$0.15/t for Devwrat Vegad