普通外文研报
Machinery, Engineering & Construction "Construction starts surged in May" Fisher
研报英文原文证据摘录
Machinery, Engineering & Construction "Construction starts surged in May" Fisher
Global Research
18 June 2026ab
Machinery, Engineering & Construction Equities
AmericasConstruction starts surged in May
Industrial
Steven Fisher, CFA
Non-res starts: monthly +61.7% YOY, L3M +30.9% YOY, L6M +20.5% YOY, L12M Analyst
+20.9% YOY steven.fisher@ubs.com
Monthly infrastructure starts increased 105.2% YOY after a 28% increase in April. +1-212-713 8634
The increase was driven by Power (+284% YOY), Bridges (+369% YOY), and Avinatan Jaroslawicz
Streets and Highways (+57% YOY). On a L6M/L12M basis, infrastructure starts Analyst
were up +32.8% YOY/+33.2% YOY. avinatan.jaroslawicz@ubs.com
+1-212-713 1405
Monthly buildings starts increased 29.3% YOY, driven by Data Centers and
Judah Aronovitz
traditional Office (both increased +138% YOY), and Manufacturing (+117%
Associate Analyst
YOY). Most of the commercial categories showed declines, including Warehouses judah.aronovitz@ubs.com
(-46% YOY), Stores & Restaurants (-14% YOY), Amusement (-19% YOY), and +1-212-713-4881
Parking Garages and Automotive Services (-21% YOY).
Lauren Sullivan
The May starts strongly align with our message on non-res construction Associate Analyst
lauren.sullivan@ubs.com
spending as starts typically lead construction put in place:
+1-212-713 8230
We expect a re-acceleration in non-res construction spending in 2H26 driven by Amit Mehrotra
data centers, power, manufacturing (pharma & semis), and infrastructure. The Analyst
starts in those categories support our view. amit.mehrotra@ubs.com
+1-201-352 1410
We expect a slow recovery in the commercial category due to elevated long-term
Julian Radlinger, CFA rates. We assume a more prolonged trough, with commercial construction
Analyst
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器