ReportGem ReportGem 中文

GLOBAL RESEARCH ARCHIVE

Machinery, Engineering & Construction "Construction starts surged in May" Fisher

Published: 2026-06-18Institution: UBS EquitiesPages: 20Original language: 英语Evidence page: 1

Research evidence excerpt

Machinery, Engineering & Construction "Construction starts surged in May" Fisher

Global Research

18 June 2026ab

Machinery, Engineering & Construction Equities

AmericasConstruction starts surged in May

Industrial

Steven Fisher, CFA

Non-res starts: monthly +61.7% YOY, L3M +30.9% YOY, L6M +20.5% YOY, L12M Analyst

+20.9% YOY steven.fisher@ubs.com

Monthly infrastructure starts increased 105.2% YOY after a 28% increase in April. +1-212-713 8634

The increase was driven by Power (+284% YOY), Bridges (+369% YOY), and Avinatan Jaroslawicz

Streets and Highways (+57% YOY). On a L6M/L12M basis, infrastructure starts Analyst

were up +32.8% YOY/+33.2% YOY. avinatan.jaroslawicz@ubs.com

+1-212-713 1405

Monthly buildings starts increased 29.3% YOY, driven by Data Centers and

Judah Aronovitz

traditional Office (both increased +138% YOY), and Manufacturing (+117%

Associate Analyst

YOY). Most of the commercial categories showed declines, including Warehouses judah.aronovitz@ubs.com

(-46% YOY), Stores & Restaurants (-14% YOY), Amusement (-19% YOY), and +1-212-713-4881

Parking Garages and Automotive Services (-21% YOY).

Lauren Sullivan

The May starts strongly align with our message on non-res construction Associate Analyst

lauren.sullivan@ubs.com

spending as starts typically lead construction put in place:

+1-212-713 8230

We expect a re-acceleration in non-res construction spending in 2H26 driven by Amit Mehrotra

data centers, power, manufacturing (pharma & semis), and infrastructure. The Analyst

starts in those categories support our view. amit.mehrotra@ubs.com

+1-201-352 1410

We expect a slow recovery in the commercial category due to elevated long-term

Julian Radlinger, CFA rates. We assume a more prolonged trough, with commercial construction

Analyst

The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.

Open report viewer