普通外文研报
ZACROS: Visit to Main Production Site for Information Electronics: A Manufacturing Site that Achieves Overwhelming Efficiency
研报英文原文证据摘录
ZACROS: Visit to Main Production Site for Information Electronics: A Manufacturing Site that Achieves Overwhelming Efficiency
Update
May 28, 2026 12:44 PM GMT
Morgan Stanley MUFG Securities Co., Ltd.+MZACROS (7917) | Japan Yoshihito Hasegawa
Equity Analyst
Visit to Main Production Site for Yoshihito.Hasegawa@morganstanleymufg.com +81 3 6836-8910
Information Electronics: A
Manufacturing Site that
ZACROS (7917.T, 7917 JP)
Mid Small Cap/Manufacturer | Japan
Achieves Overwhelming Stock Rating Overweight
Industry View In-Line
Price target ¥1,800Efficiency Shr price, close (May 28, 2026) ¥1,290
Mkt cap, curr, basic (bn) ¥94.0
Avg daily trading value (bn) ¥0.3
Key Takeaways
The Numata site comprises Plant 1 (completed Jun 1992), Plant 2 (completed Aug
2001), and Plant 3 (scheduled for completion by end of this year). Plant 3 plans
to install a 3m-wide machine for PF.
Zacros opened a lab coater in a Class 10 cleanroom for materials for
semiconductor middle-of-line (MOL) processes, to be a new pillar following PF
and ABF (conducts over 300 prototype trials annually).
The Showa site, where customers and a logistics company are co-located in the
same block, was completed in 2007. For ABF, which spans many product types
and mass-production items, specialist vendors strictly manage storage thermal
histories.
ABF production capacity is set to rise to about 3x 2023 levels with additional
lines at Showa (construction scheduled to start next year); near-term increase in
ABF demand can be addressed by strengthening slitting capacity.
'Information recording materials,' such as ABF in Information Electronics,
positioned as growth drivers alongside Bio and Healthcare in 'SUB', 'Overseas
Packaging and Containers.'
On May 27, we had the opportunity to visit Zacros' Numata Plant (Numata City,
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器