普通外文研报
VRT: Analyst Mtg Takeaways: Hyper-Growth with a Bull Case
研报英文原文证据摘录
VRT: Analyst Mtg Takeaways: Hyper-Growth with a Bull Case
us at high-teens, EPS, Adj Diluted Q1 Q2 Q3 Q4
operating margin of 27% (matching expectations), and implied +$17 2030 2025 0.64A 0.95A 1.24A 1.36A
2026 1.17A 1.40E 1.81E 2.02E EPS or 22% upside vs. pre-event consensus. While these are decidedly 2027 1.51E 1.99E 2.42E 2.67E
impressive growth/profitability metrics, we see some conservatism baked Revenue
in. Management is assuming 30% incrementals (vs. its 38% average since 2025 2,036.0A 2,638.1A 2,675.8A 2,880.0A
2021) and is not including M&A or buybacks with its estimated $28 billion 2026 2,649.5A 3,368.1E 3,710.0E 4,081.1E
2027 3,392.7E 4,403.0E 4,671.8E 5,075.5E in capital. Management highlighted an active funnel of potential bolt-
on deals with a strong balance sheet currently at just 0.2x net leverage. All values in USD unless otherwise noted.
“Evolutionary” deals driving +15% ROIC could add another $4.00-$4.50 Priced as of prior trading day's market close, EST (unless otherwise noted).
EPS, netting to a bull case $21-$22 EPS in 2030, 50% above consensus.
Hyperscalers/colos are increasingly seeking scale and speed for “time to
first token” and “token per watt/second”, driving Vertiv’s innovations in
pre-fabricated converged infrastructure solutions. System-level integration
leads to further co-engineering/designing for the next-gen GPU clusters
and 800VDC environments, ultimately calling for more services.
Biggest Surprise: Pre-fab converged infrastructure solutions and services
as a moat. We were impressed to see SmartRun (pre-fab white space
systems) for the next-gen GPU clusters being built at Pelzer, SC. Higher
voltage, rack density, and complexity for purpose-built AI datacenters are
making services as equally important for early customer partnership.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器