普通外文研报
Daily Current "Brazilian Utilities" Ajeje
研报英文原文证据摘录
Daily Current "Brazilian Utilities" Ajeje
Global Research
18 May 2026ab
Daily Current Equities
Latin AmericaBrazilian Utilities
Utilities
Giuliano Ajeje
Union defends LRCAP in court and says suspension can generate reverse damage Analyst
According to MegaWhat, the Federal Government defended in court the legality of giuliano.ajeje@ubs.com
the 2026 Reserve Capacity Auction (LRCAP) and stated that the suspension of the +55-11-2767 6371
effects of the auction may generate a risk of reverse damage to the sectoral public Henrique Simoes
interest, with an impact on energy security, expansion planning and costs for Associate Analyst
consumers. (link) henrique.simoes@ubs.com
+55-11-2767 6308
CCEE implements new accounting rules for hydroelectric plants in the MRE Julia Ongarato
According to MegaWhat, the Electric Energy Trading Chamber (CCEE) concluded last Associate Analyst
week the implementation of systemic and operational adjustments to update the julia.ongarato@ubs.com
+55-11-2767 6694
rules applicable to hydroelectric plants not centrally dispatched under the Energy
Reallocation Mechanism (MRE). Among the main changes is the adoption of new
methodologies for evaluating the performance of hydroelectric plants participating
in the MRE. One of them considers the comparison between the average generation
of the plant and its physical guarantee, using indicators such as the Generation
Factor (FG) and the Contribution Factor to the MRE (FCM), calculated by the CCEE.
Another innovation is the measurement of water unavailability through the poured
flow (IVV), a mechanism that makes it possible to differentiate hydrological impacts
from operational unavailability of hydroelectric plants. (link)
Without dispute, Acciona wins sanitation PPP in Paraíba
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器