普通外文研报
Underpromise and Overdeliver; Strong 1Q Earnings & FCF Beat
研报英文原文证据摘录
Underpromise and Overdeliver; Strong 1Q Earnings & FCF Beat
Canada | Metals & Mining
Barrick Mining Corp EquityMayResearch11, 2026
FLASH NOTEUnderpromise and Overdeliver; Strong 1Q
RATING BUYEarnings & FCF Beat
PRICE $43.13^
A strong 1Q driven by higher prod'n & lower costs. Street was modeling 1Q
based on 640-680koz guide (+ readthroughs from NEM's 1Q print) vs 719koz PRICE TARGET | % TO PT $63.00 | +46%
actual. Prod'n is expected to improve across '26 (incl ~750koz in 2Q). We 52W HIGH-LOW $54.69 - $17.41
continue to think B is significantly undervalued at 0.6x P/NAV, and strong FLOAT (%) | ADV MM (USD) 99.7% | 501.67
quarterly performance helps, but a material re-rating likely requires divesting MARKET CAP $74.0B
assets in challenging jurisdictions & the NA IPO. Buyback authorization doubled TICKER B ^Prior trading day's closing price unless otherwise
to $3bn. noted.
Earnings and FCF beat. 1Q26 adj. EPS of $0.98 beat our $0.80 estimate and $0.83 cons.
Consolidated 1Q EBITDA of $3,933M also beat our $3,516M estimate and $3,455M cons. The
earnings beat was due to a combination of higher gold sales and lower production costs. 1Q
consolidated FCF of $1,575M was better than our $1,285M estimate and $1,265M cons.
Production and costs beat. 1Q attributable gold production of 719koz exceeded our 688koz and
694koz cons at cash costs of $1,327/oz (vs our $1,496/oz and $1,403/oz cons). The production
beat was driven by outperformance at NGM (376koz vs. our 360koz) and Loulo Gounkoto (64koz
vs our 37koz). AISC of $1,708/oz was also better than our $1,965/oz and $1,889/oz cons. Copper
production of 49kt was in line with our 50kt, and AISC of $3.67/lb was below our $3.92/lb.
2026 guidance reiterated, with 730-770koz production planned for 2Q. B maintained its 2026
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器