ReportGem ReportGem

REAL-TIME GLOBAL RESEARCH

Northern Star Resources Ltd.: Questions for management

Published: 2026-08-20Institution: JPMorganPages: 10Original language: English

Research evidence excerpt

J P M O R G A N

Asia Pacific Equity Research

20 August 2026

Northern Star Resources Ltd.

Questions for management

Neutral

NST.AX, NST AU

Price (20 Aug 26):A$23.94

Price Target (Jun-27):A$22.30

KCGM ramp / FY27 shape: FY27 KCGM guidance is 550–650koz, with the

midpoint 6% below BBG consensus, but the top end 2% above. What

specifically needs to go right to deliver the 650koz top end — throughput,

availability, grade, recovery or Stage II timing? How should we think about the

quarterly shape through FY27, particularly around the Sep tie-in and early

ramp? What operating milestones would give you confidence that KCGM is

tracking towards the upper half of guidance?

KCGM throughput / medium-term ramp: You have reiterated a ~2-year

ramp towards 27Mtpa, but have not provided FY28/29 throughput guidance.

What needs to be demonstrated before you are comfortable reinstating a

medium-term throughput profile? Is the prior ~23/25/27Mtpa trajectory still

directionally reasonable, or should we assume the ramp has shifted right?

KCGM recovery / Stage II: Stage II is expected late 1H27 and should add

~1–2ppt recovery. What recovery should we assume before Stage II is

commissioned, particularly with lower-grade stockpile feed? How quickly

should the recovery uplift be realised after Stage II, and what are the main

technical risks to achieving the 1–2ppt improvement?

KCGM feed mix: How should we think about the mix of primary ore, UG ore

and low-grade stockpiles through FY27/28? How much high-grade stockpile

material is available to support the ramp, and does the feed mix become more

or less favourable as throughput rises?

KCGM underground: FY27 UG ore guidance is 3.5-4.0Mt, with the longerterm aspiration still ~8Mtpa. What are the key development and infrastructure

milestones required to reach 8Mtpa? How should we think about the timing of

the step-up and the required capital beyond FY27?

Fimiston South / Golden Pike: FY27 includes 60-65Mt of material

movement at KCGM. How long should we expect this level of waste

movement to continue? When does Golden Pike/Fimiston South start

contributing meaningfully higher-grade ore, and how important is that to the

The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.

Open report viewer