Latin AmericaBrazilian Utilities
Utilities
Giuliano Ajeje
Favorable hydrology and lower load pressure energy prices on BBCE Analyst
According to MegaWhat, energy prices traded on the trading floor of EHUB, BBCE's giuliano.ajeje@ubs.com
business platform, fell again in the week of June 8 to 12, with a highlight to +55-11-2767 6371
contracts maturing in 2026. Among the main drops is the conventional contract with Henrique Simoes
delivery in the Southeast and maturing in July, with a retraction of 17.06%, from R Associate Analyst
$187.19/MWh to R$155.25/MWh. (link) henrique.simoes@ubs.com
+55-11-2767 6308
Interconnection with Bolivia may alleviate generation cuts in Brazil Julia Ongarato
According to MegaWhat, the electrical interconnection between Brazil and Bolivia Associate Analyst
has the potential to contribute to the reduction of power cuts, especially in periods julia.ongarato@ubs.com
+55-11-2767 6694
of high solar production and low demand. The assessment is included in a planning
study by the National Electric System Operator (ONS) on the feasibility of the future
420 MW international connection. (link)
Default in MCP rises to R$94.8mn in April, driven by 2W and Electra Varejo
According to MegaWhat, the effective delinquency in the financial settlement of
the Short-Term Market (MCP) for April rose to R$94.8mn, an increase of R$34.5mn
compared to the R$60.25mn recorded in the March operation, according to data
from the Electric Energy Trading Chamber (CCEE). The increase was mainly
concentrated in the entry of Electra Energia Digital in the list of delinquent agents
and in the growth of the debt of 2W Comercializadora Varejo. (link)