PRIO just hosted its 2Q26 conference call. Overall, discussions centered on
portfolio execution, continued deleveraging, shareholder remuneration, and
upcoming milestones across the company's development projects. For more details
on the reported figures, refer to PRIO: 2Q26 Results: Strong FCF Anchors a Solid
Quarter as Expected. See details below.
Milene Clifford Carvalho AC
Rodolfo Angele, CFA
Operational update: Production was supported by the continued rampup of Wahoo, despite lower operational efficiency across most assets.
(a) Cluster Valente (Frade + Wahoo): Operational efficiency remained
high at 90.9%, but below the 98.6% reported in 1Q26. As previously
disclosed, Frade was impacted by a gas lift line failure in early May, which
temporarily interrupted production from three wells. The replacement was
completed in July and production has since normalized. The main highlight
for the cluster was the continued ramp-up of Wahoo, with the third and
fourth wells brought onstream in April and June, respectively.
Management also highlighted that the fourth well connection was delayed
by vessel availability issues, but was ultimately completed using PRIO's
own vessel. Looking ahead, management highlighted positive results from
two reservoir data acquisition (RDA) wells at Frade, supporting the drilling
of two additional production wells in 2H26.
(b) Bravo Cluster (Polvo + Tubarão Martelo): Operational efficiency
declined to 95.2% (from 98.3% in 1Q26). Production during the quarter
was impacted by the temporary shutdown of well OGX-44HP following a
BCS failure at the end of March, with the workover completed in May.
Management noted that production resumed in mid-May following the
completion of the intervention, after temporarily relocating the rig that had
been operating at Frade.
(c) Albacora Leste: Operational efficiency declined to 85.9% (from
95.4% in 1Q26). Performance was impacted by the shutdown of well
ABL-68 following hydrate formation in April, with operations normalized
…
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.