GLOBAL RESEARCH ARCHIVE
Integrateds, Refining, and Midstream: Behind the Meter Bonanza: Part 1 – What is the current landscape?
Research evidence excerpt
Integrateds, Refining, and Midstream: Behind the Meter Bonanza: Part 1 – What is the current landscape?
However, BofA’s power analyst, Ross Fowler, forecasts only 93GW of accredited supply
coming online in the 2026-2030 timeframe. This does not mean total capacity, ELCC
(Effective load carrying capability) evaluates the reliable capacity that renewable
resources can contribute to the grid, particularly during peak demand, and are critical to
understanding the incremental firm demand the grid can handle. For example, 100MW of
tracking solar in PJM is only worth 14MW of accredited supply.
Exhibit 5: US on-grid accredited net power additions of 93 GW over 2026-30
Texas represents 61% of net supply additions
(MW) California Carolinas Central Florida Mid-Atlantic Midwest Southeast Southwest Tennessee Texas US
2027 67 190 2,243 134 634 875 840 1,994 409 11,243 18,628
2028 53 306 2,964 130 796 1,959 837 2,013 524 16,235 25,817
2029 61 418 3,055 211 928 1,581 827 1,934 533 18,490 28,039
2030 69 296 2,328 166 1,786 992 556 2,207 579 11,559 20,539
2026-30 250 1,211 10,590 641 4,144 5,406 3,060 8,148 2,046 57,527 93,023
Source: BofA Global Research
BofA GLOBAL RESEARCH
Despite datacenter operators’ preference for the grid (reliability, resiliency and emission
reduction benefits from a power system at scale), the mismatch between unconstrained
demand (177GW) and accredited supply (93GW) means >80GW would need to be met by
behind the meter applications. Behind the meter is bringing your own power generating
assets to a project to bypass using the utilities public transmission grid, solves the
speed and certainty of power questions. When large scale compute is your core business,
this means that risking any multi-year delay could be worth billions in revenue and your
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.
Open report viewer