实时全球研报
Capstone Copper: 2Q26 First Take: Solid result with EBITDA ahead of consensus
研报英文原文证据摘录
Capstone Copper: 2Q26 First Take: Solid result with EBITDA ahead of consensus
J P M O R G A N Asia Pacific Equity Research
31 July 2026
Capstone Copper Overweight
CSC.AX, CSC AU
2Q26 First Take: Solid result with EBITDA ahead of Price (30 Jul 26):A$12.78
consensus Price Target (Jun-27):A$17.30
Key takeaways: 1) EBITDA of $354m was ~4% above JPMe/consensus $340m,
on higher sales and realised price 2) At the asset level, Mantoverde cathode and
sulphide production was ahead of JPMe, offset partly by lower Pinto Valley output.
Group C1 was 6% ahead of JPMe with most operations above except for
Mantoverde. 3) FY26 production and cost guidance is unchanged at the Group
level at 200–230kt copper and $2.45–$2.75/lb C1 cash costs. The Board has
approved the MV Pyrite Augmentation project ($45m capex) aimed at reducing Australia
acid costs and increasing production (3.5ktpa) from early 2028. Overall, it was a
Head of Australia Metals & Mining
relatively strong EBITDA and production outcome again market fears due to
potential acid constraints. Finally, net debt came in below our forecast at $675m. Lyndon Fagan AC
(61-2) 9003-8648
• Key Positives. EBITDA of $354m came in 4% ahead of company compiled lyndon.fagan@jpmorgan.comJ.P. Morgan Securities Australia Limited
consensus/JPMe ~$340m. Mantoverde was stronger than JMPe, with grades
Jonathon Sharp
expected to rise in Q4. Copper sales were 5% ahead whilst realised price was
(61 2) 9003-8312
also stronger at $6.22/lb vs JPMe $6.08/lb. Net debt was 10% better than JPMe jonathon.sharp@jpmorgan.com
• Key Negatives. Group C1 costs came in 6% ahead of JPMe. EPS of $0.13/sh J.P. Morgan Securities Australia Limited
was lower than the company-compiled consensus of $0.15/sh. Devwrat Vegad
(91-22) 6157-3608
• Outlook and projects.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器