实时全球研报
Messy 2Q? Yes. Story-Changing? No. Remain OW Following Results
研报英文原文证据摘录
Messy 2Q? Yes. Story-Changing? No. Remain OW Following Results
IdeaMExhibit 1: Summary of feedback today
Big topics What we heard What we think
Agree it is certainly not great news to see a downgrade, but Saipem had not cut
guidance in 1Q. With the situation around the SoH still uncertain, that was a risk
Guidance downgrade is a negative surprise.
going into results, which we noted in our preview. Also, the cut was SoH-driven and
not due to poor execution.
New guidance reflects additional costs, but assumes shipments go through Maybe, it is a risk if the SoH remains fully closed over that period. But then, there
the SoH in the end; could that pose more guidance downgrade risks in the should arguably be other macro implications from the continued closure (oil, gas,
future? OFS demand in other regions).
Guidance
If navigation through the SoH never fully normalises, additional costs
Agree, and that is a risk to the story. But in that case, all OFS companies present in
would have to be added to forecasts until the current backlog is
the ME will face that risk (Technip, etc).
concluded.
We are not big fans of guidance that includes W/C volatility either. But that was a
FCF guidance was retained due to W/C and that is a poor driver of FCF. point raised by most investors we spoke to and likely already reflected in the share
price weakness today.
We did not have that cost in our model, but it is an initiative aimed at making the
Redundancy company leaner in the end of the day (intent is to be NPV positive over time). The
The market was not expecting these incremental costs at this point.
provisions provisions were not driven by unforeseen costs from project execution, which would
have been a real concern.
Yes, big miss, driven by downtime.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器