实时全球研报
Hyundai Rotem: Downgrade to N; 2Q OP miss and lack of near-term order clarity
研报英文原文证据摘录
Hyundai Rotem: Downgrade to N; 2Q OP miss and lack of near-term order clarity
Prev Cur Δ
Adj. EPS - 26E (W) 9,761 7,777 -20.3%
missed; the company guided to Rail Solutions margin expansion from 2027 as Adj. EPS - 27E (W) 12,818 10,653 -16.9%
higher-margin export projects (e.g., Morocco) ramp.
• Earnings checklist follow-up (please refer to table 1): From the conference Quarterly Forecasts (FYE Dec)
and IR follow-up, we received incremental color on: 1) defense export sales Adj. EPS (W)
2025A 2026E 2027E
trajectory and Poland production pace, 2) export OPM above the 30% mark, Q1 1,451 1,845A 2,046
3) domestic sales and OP outlook, and 4) reconfirmation of Poland K2 PL sales Q2 1,747 1,707A 2,664
trajectory. However, we did not get much of an update on the order pipeline. Q3 1,819 1,972 2,955
Q4 2,038 2,254 2,988
All in all, we lower our 2026E/2027E OP estimates by 21%/16%, mainly FY 7,055 7,777 10,653
driven by the export defense outlook reset: we lower our 2026 Poland EC1
sales assumption to ~W60-70B per quarter and trim Poland EC2 ASP Style Exposure
assumptions (for both GF and PL) after the headline sales miss. With a lower
EC1 miss, we step export OPM down to the mid-30s from the high-30s. For
domestic, we raise sales estimates on higher mass production, but revise
domestic OPM lower as the project appears margin-dilutive.
• Order update: Pipeline visibility remains limited: Peru is still guided as the
nearest-term signing (expected 2H26). Poland EC3 discussions are in
preparation (specs and GF/PL mix), Iraq appears delayed (management
targeting year-end at the earliest), and Romania MBT RFP is expected this year
with an award timeline around 2027.
• PT cut to W180K, D/G to N: Our prior bullish view was anchored on a strong
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器