实时全球研报
Sunshine gets Brighter; New Results Support Resource Expansion
研报英文原文证据摘录
Sunshine gets Brighter; New Results Support Resource Expansion
IdeaMstrengthen the case for the 2ktpd concentrator we assume in our base case.
Upcoming Catalysts: We see a steady catalyst path de-risking the project through
first production in 4Q28: 1) ongoing definition drilling and engineering design work
(2026-27); 2) the start of mill construction and infrastructure upgrades (2026-27);
3) completion of the Sunshine Mine feasibility study and FID package (1H27); 4) the
feasibility study for the antimony plant and silver/copper refinery (1H27); 5) renewal
of the IPDES wastewater discharge permit (2H27); 6) construction of the antimony
plant and silver refinery (2027-28); and 7) first production of silver, antimony,
copper and lead (4Q28). The drilling results feed the first of these keeping the
timeline/catalyst path intact.
We recently initiated coverage of Sunshine Silver Mining & Refining (SSMR) at
Overweight. The stock offers what we see as a compelling 2:1 bull-bear skew, and
our midyear 2027 price target of $23 implies ~60% upside. The stock trades at a P/
NAV multiple of 0.6x on our base/bull blended NAV of $23/sh. Sunshine is focused
on restarting the historic Sunshine Mine, which has indicated mineral resources of
103.9Moz at 1,022 g/t Ag and inferred mineral resources of 159.8Moz at 776 g/t Ag
— grades as much as 2-4x above those of operating silver mines in the Americas.
Along with the mine restart, the company is also conducting a feasibility study (FS)
to consider the restart of an on-site silver refinery and construction of an antimony
plant, supplying U.S. markets with refined USGS designated critical minerals. The US
is reliant on imports for over half of the country's silver and antimony demand, with
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器