Over the prior week, several third-party analysts, including BloombergNEF, IT Hardware/ Telecom & Networking
Gartner, and Datacenter Hawk, hosted webinars to discuss latest views on the data Equipment
center demand outlook and project pipelines. Key takeaways from the webinars Joseph Cardoso AC
are: (1-212) 622-9036
joseph.cardoso@jpmchase.com
• Demand for data center capacity continues to expand at a robust pace. AI Manmohanpreet Singh
has reset the capex baseline, driving a clear shift in both the size and number (1-212) 622-4527
of individual data center campuses needed to house advanced AI infrastructure manmohanpreet.singh@jpmchase.com
and support continued innovation (individual campuses now exceed 10 GW vs. Marc Vitenzon
traditional 1 GW). Bloomberg’s base case, built on current project timelines (1-212) 622-3342
and buildout, implies U.S. data center power demand reaching 118 GW by the marc.vitenzon@jpmchase.com
end of the decade, up from a prior (2H25) forecast of 77 GW. That upward Akanksh Chauhan
revision is driven by a rapidly growing project pipeline but, according to the (1-212) 622-0045
akanksh.chauhan@jpmorgan.com
Bloomberg analysts, remains conservative. A more aggressive “AI-chip” case, J.P. Morgan Securities LLC
meanwhile, based on AI server forecasts from semiconductor manufacturers
and OEMs, points to demand of 160 GW by the end of the decade.
Figure 1: U.S. Data Center Demand Outlook Figure 2: Base Case vs. AI-Chip Case Outlook
2030 GW
GW
140 200 1H 2026 Base Case AI-chip Case 1H 2026
118 160 120
77 120 118
60 80