-25 Jan-26 Mar-26 May-26 Jul-26-10%
lowering the ceiling from 10.6% to 10.3%. Earning the prior 10.1% remains possible but requires out- .Source: Bloomberg,Prem/(Disc)Jefferiesvs RegulatedLLC.Electric Peers Average 1.1%
earning the new level by 30bps; which the band permits. Decoupling and the MYRP reduce recovery Elevated rate case risk coincident with
lag; earned ROE still depends on execution, cost, load, and timing. elevated political risk in the Carolinas have
contributed to a de-rate in shares.
A refund mechanism on capex and in-service timing extends an olive branch to Staff. The MYRP
Rider is one-way but not dollar-for-dollar: refunds equal a composite rate, 1 minus the product of the
completion and revenue requirement ratios, times the aggregate shortfall; the composite nears zero
only if both ratios near 100%; DEC withdrew its Timely Completion PIM in exchange. Contingency drops
to 25% of prior estimates, the Breaker Replacement Program is halved, and the DOE funded Belews
Creek portion and NextGen GIS come out, with no further MYRP2 reductions; the bridge to the
$600m is not quantified. Separately, $173.2m (system) of large load interconnection facilities leaves
the historic base case with no regulatory asset treatment; interim return is foregone, not deferred;
DEC may seek the underappreciated balance later. The $111m of other stipulated adjustments awaits
testimony due by July 20.
The readthrough for DEP: while the stay out and tariff process remain conditional. The named
terms, 9.8% and 53% (DEP's current authorized), the refund mechanism, no blanket MYRP2
reduction, and 25% contingency, cut the odds of Staff's 9.50% and 51% DEP position; plant items
and impairments vary.