First Read China PCB Sector Our initial read on potential Kyber backplane delay and sector updates
研报英文原文证据摘录
First Read China PCB Sector Our initial read on potential Kyber backplane delay and sector updates
Global Research
7 July 2026ab
First Read
EquitiesChina PCB Sector
Our initial read on potential Kyber backplane China
delay and sector updates Communications Technology
Jimmy Yu
Analyst
jimmy.yu@ubs.com
Kyber orthogonal backplane delay in-line with our expectation +86-21-3866 8880
Recent press noted NVDA Kyber rack architecture is facing delays to 2028 due to supply Edward Liu
chain challenges on PCB backplane. We view this timeline as in-line with our expectation Analyst
based on our early industry study from upstream CCL vendors back in May, suggesting edward.liu@ubs.com
potential delays of orthogonal backplane to Feynman in 2028. This was corroborated by +852-3712 3981
Victory Giant mentioned in our H-share Corp Day (link) that there are currently 10+ David Chow
material/vendor combinations being considered including different layer count designs. Associate Analyst
We see potential challenges are: 1) M9+Q-glass' processing difficulties, inadequate david.chow@ubs.com
supply and higher costs vs. other possible solutions (e.g. with low-dk2); we believe this +852-3712 3512
option is on hold for the Kyber backplane despite multiple rounds of trials; 2) PTFE’s
unexpected emergence as an optimal alternative due to its outstanding performance
and improving yield, despite time required for supply chain readiness with further testing
and; 3) suboptimal yields on the PCB side as both Q-glass and PTFE materials demand
much higher manufacturing capability on a 100+ layer form factor. We think the impact
on PCB companies earnings in 2026/27E could be limited as Kyber was originally
expected in late 2027 on Rubin Ultra with relatively small volume, and despite a slightly