Brazil Homebuilding
Project-Level Data on Brazilian Homebuilders: Cury Improving –
May/26
Andre Mazini, CFA AC
CITI'S TAKE +55-11-4009-2017
We update our novel dataset for Brazilian homebuilders, providing andre.mazini@citi.com
information on a project-by-project level. We scrap information from each Piero Trotta
project’s website to assess metrics such as the duration at launch and under
construction status, and then provide statistics, such as which companies +55-11-4009-7781
have projects taking longer to complete than average. Cury continues to piero.trotta@citi.com
reduce the share of projects exceeding 36 months under construction from Kiepher Kennedy
14.3% (Feb26) to 9.5% (May26), indicating better execution discipline. On +55-11-4009-2641
launches, Cury also reduced the launch projects above 6 months from 57%
(Dec25) to 28% (May26), while Direcional’s remains elevated at roughly 51%. kiepher.kennedy@citi.com
Eztec continues to stand out as the most stable peer, maintaining tight
control over launch timelines with minimal deviations from its historical
pattern. Cyrela maintained stabilized launch durations, while its under-
construction projects went to 16% in May (+3% MoM), given the Arbo
Residences (RS) project that exceeded its average duration.
Our methodology — We use web scraping techniques to access each project’s
website (such as Eztec’s, link), check how long the project stays under the launch
status (showroom is open) and construction work status. Average launch period is
uniform at six months for Direcional and Cury, and nine months for Cyrela and Eztec,