India Power: Solar goes moonlighting
研报英文原文证据摘录
India Power: Solar goes moonlighting
22 June 2026
Equities
Utilities India Power
Solar goes moonlighting India
◆ Storage contribution during evening peak reaches c4.5GW Puneet Gulati*, CFA
as operational BESS capacity rises to 7.5GWh Senior Analyst, India Energy, Property & Infra
HSBC Securities and Capital Markets (India) Private Limited
puneetgulati@hsbc.co.in
◆ Demand growth continues into June at 8.5% y-o-y with peak +91 82 9189 7591
demand at 260GW; solar capacity addition moderates Sambhav Kela*
Analyst, India Real Estate & Power
◆ ALMM II kicks in from 1 June, approved cell manufacturing sambhav.kela@hsbc.co.in
capacity at 30.5GW to keep module supply tight +91 22 40891464
Energy storage stepping up amidst worries of solar curtailment and evening * Employed by a non-US affiliate of HSBC Securities (USA) Inc, and is
not registered/ qualified pursuant to FINRA regulations.
peak shortage. Battery energy storage system (BESS) capacity in India reached
2.7GW / 7.5GWh, with May alone witnessing 1.6GWh of capacity addition as RE
developers capitalize on merchant arbitrage opportunity. Energy storage systems are
increasingly contributing to cater to the evening peak demand, with BESS and PSP
contributing as much as c4.5GW at the time of evening peak of c240GW at 22:45 on
2 June while drawing a similar maximum amount during solar hours (see page 2 for
the average renewable curve in June). The under-construction BESS pipeline stands
at c42GWh, with another c40GWh of awarded projects in the pipeline. India is set to
witness significant BESS capacity addition over the next three years, with CEA
estimating capacity to reach c25GWh by the end of this fiscal year and 91GWh /
139GWh by FY28 / FY29 end.
Delayed rains, rising heatwaves cause power demand to soar as we brace for