普通外文研报
Agnico Eagle Mines Ltd. / Agnico Eagle Mines Ltd.: Lowering production and estimates, no change to post 2030 outlook
研报英文原文证据摘录
Agnico Eagle Mines Ltd. / Agnico Eagle Mines Ltd.: Lowering production and estimates, no change to post 2030 outlook
Equity Research
2 July 2026
Agnico Eagle Mines Ltd. / Agnico Eagle Mines Ltd.
Lowering production and
estimates, no change to post 2030
North America Metals & Miningoutlook
POSITIVE
Rock mass movement at Barnat open pit impacts Canadian Unchanged
Malartic North America Metals & Mining Richard Garchitorena
+1 212 526 5697
Lowering production forecasts, estimates and PT, maintain OW rating: Following updated richard.garchitorena@barclays.com
production forecasts to reflect the rock mass movement incident at Canadian Malartic, we BCI, US
reduce our estimates and PT for AEM. However, we maintain our OW rating on the shares, given Liqi Peng
our confidence in management to recover and deliver stated production growth targets over +1 212 526 1964
time, with valuation attractive vs. historical levels. Our revised US$210 PT (prior US$213 PT) is a liqi.peng@barclays.com
blended methodology of 1) EV/EBITDA multiple of 8.0x our 2027 EBITDA est. of $12.3b (30% BCI, US
weighting) and 2) 1.3x our NPV valuation (70% weighting). Our revised CAD$298 PT (vs. prior
CAD$292) reflects recent changes in USD/CAD exchange rate.
Rock mass movement at Barnat open pit and NT Impact: AEM reported that a rock mass
movement on July 1 along the north wall of the Barnat open pit at its Canadian Malartic
operations has resulted in a temporary suspension of mining operations in the Barnat open pit.
While 2Q26 production was unaffected (expects ~845k ozs of gold vs. our prior forecast of 831k
ozs), 2H26 production is expected to be reduced by 60-80k ozs, with full year production now at
the low end of the prior range of 3.3-3.5m ozs.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器