普通外文研报
DEME (AO) | Buy | New large hopper order underpins confidence in dredging outlook
研报英文原文证据摘录
DEME (AO) | Buy | New large hopper order underpins confidence in dredging outlook
News comment
Release date: 02 July 2026
Philip Ngotho, CFA
Equity Research Analyst
+31 20 563 2367
pngotho@keplercheuvreux.com
BuyDEME
Belgium | Energy equip. & services MCap: EUR4.3bn
Target Price: EUR240.00 Bloomberg: DEME BB Reuters: DEME.BR
Current Price: EUR171.40 Free float 26%
Up/downside: 40.0% Avg. daily volume (EURm) 3.9
YTD abs performance 22.6% Market data: 01 July 2026
52-week high/low (EUR) 204.00/121.40
New large hopper order underpins confidence in dredging outlook
Key points:
Yesterday, DEME announced that it has ordered a new hopper (22k m3 capacity) to strengthen its dredging fleet. Once delivered
the vessel will belong to one of the larger hoppers within DEME's fleet.
Delivery of the vessel is scheduled for 2029 and the capex level is indicated to be between EUR 150-300m. Importantly, DEME's FY
2026 capex guidance of about EUR 450m is left unchanged.
Overall, we see the order as a logical fleet-renewal and growth investment and the news as an incrementally positive indicator on
the prospects for the dredging market outlook. We reiterate our Buy rating as as in our view DEME offers a balanced mix of more
steady infrastructure cash flows (dredging) and secular clean-energy growth (offshore wind). The shares, trading at a double-digit
FCF yield, remain attractively valued in our view.
Details
The hopper will feature an advanced power plant and propulsion system, a hydrodynamically optimized hull, more efficient
dredging technology, and a high level of automation. DEME expects these features will lead to higher productivity, improved
energy efficiency and stronger operational reliability, ultimately improving the vessel’s cost competitiveness.
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器