CP2 - Proposed Nameplate Capacity Continues to Increase +1-212-713 4399
VG filed an application for CP2 to expand its Terminal to add 6 additional liquefaction Sumantra Banerjee
blocks (just like those already approved), another gas-fired power plant (just like those Associate Analyst
two previously approved), a third marine berth within the already approved berthing sumantra.banerjee@ubs.com
area, and related facilities. The proposed CP2 LNG Expansion facilities will increase the +1-212-713 5104
maximum peak liquefaction and export capacity of the CP2 LNG Terminal under optimal Saumya Jain
conditions by ~11.7 MTPA (~ 620.5 Bcf/year). VG plans to begin construction Associate Analyst
immediately upon receiving Commission authorization and necessary permits, and saumya.jain@ubs.com
requests the Commission to issue an expansion order authorizing this by YE 2026. If the +1-212-882 0089
project is approved this year, VG will target the expansion's startup by YE 2028 and Ivan Scotto
being placed in service (after commissioning) by YE 2030. The total estimated Associate Analyst
construction cost for the currently authorized CP2 LNG project is >$30B, and the ivan.scotto@ubs.com
estimated added cost of this proposed expansion exceeds $10B. Separately, this project +1-212-713 3137
will also include the CP Express pipeline, costing ~$826M. (link to full report). Richard DeDios
Associate Analyst
Deep Dive: XOM & CVX Push the Limits of Permian, Raising EUR and Lowering richard.dedios@ubs.com
Breakeven +1-212-713 8018
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器