Record Production at Kipushi
June 4, 2026 | 11:47 ET~
Ivanhoe Mines Metals & Mining - International
Andrew Mikitchook, P.Eng., CFA Analyst
andrew.mikitchook@bmo.com (416) 359-5782
IVN-TSX Rating Price: Jun-3 Target Total Rtn
Outperform $12.35 $16.00 30% Chris Ziger Associate
chris.ziger@bmo.com (416) 276-3715
Legal Entity: BMO Nesbitt Burns Inc.
Bottom Line:
Kipushi continues to break production records and add value to the Ivanhoe
portfolio. Debottlenecking efforts at the mill have shown measurable improvement 22 2YR Price Volume Chart
while the mine has demonstrated the ability to perform and increase stockpiles. With 20
rising zinc prices and increasing throughput while maintaining high grades and high 18
recoveries, we anticipate a strong performance from Kipushi in 2026. 16 20
12 10
Key Points 10 5
To date, the Kipushi mine has produced 110,000 tonnes of zinc, and is on track 8 Dec Jun Dec Jun0
to produce ~265,000 tonnes, placing production at the midpoint of guidance of LHS: Price (C$) / RHS: Volume (mm) Source: FactSet
240,000 to 290,000 tonnes for 2026. The mine/mill is operating well with continuing
performance increases since the restart of operations in June 2024 with a new record
of 25,677 tonnes produced in May, beating the previous record in January 2026 by 12%
with 22,968 tonnes produced.
In May, high-grade stockpiles averaging ~37% zinc, and low-grade stockpiles
averaging ~22% grew to 12,000 tonnes and 254,000 tonnes, respectively. The
growing high-grade stockpile shows room for further debottlenecking of the processing
plant to meet the current 960,000tpa capacity, which could see production of over
300,000 tonnes of zinc.
Construction on the second tailing storage facility is over 90% complete, with first
depositing expected in October 2026.