普通外文研报
Daily Current "Brazilian Utilities" Ajeje
研报英文原文证据摘录
Daily Current "Brazilian Utilities" Ajeje
Global Research
22 May 2026ab
Daily Current Equities
Latin AmericaBrazilian Utilities
Utilities
Giuliano Ajeje
Aneel approves LRCAP 2026 and confirms contracting of thermal plants Analyst
According to MegaWhat, Aneel approved, in an extraordinary public meeting on giuliano.ajeje@ubs.com
Thursday, May 21, the approval of the results and the award of thermoelectric +55-11-2767 6371
products from the 2026 reserve capacity auctions (LRCAP), releasing the Henrique Simoes
contracting of winning plants in the bids aimed at natural gas, coal, coal, Associate Analyst
hydroelectric plants, in addition to fuel oil, diesel oil and biodiesel projects. (link) henrique.simoes@ubs.com
+55-11-2767 6308
CMSE to decide CVar at June meeting Julia Ongarato
According to MegaWhat, after postponing a possible change in the risk aversion Associate Analyst
criteria (CVar) in the operating models and energy price formation at the ordinary julia.ongarato@ubs.com
+55-11-2767 6694
meeting in May, the Electric Sector Monitoring Committee (CMSE) has until July 31
to decide on the issue. The government's expectation, according to MegaWhat, is
that the decision will be taken at the next ordinary meeting, in early June, but this
will depend on the conclusion of the additional studies requested by the committee
in relation to the impacts of the reserve capacity auction (LRCAP). (link)
Lack of flow and economic risk lead to the abandonment of ~800 MW in solar
According to MegaWhat, Aneel revoked, upon request, another 806 MW of installed
capacity of photovoltaic solar plants in the states of Bahia and Minas Gerais.
According to the entrepreneurs, from Álamo Energia Renováveis and Edena Energia
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器