普通外文研报
US Power & Utilities: Watt’s Happening in ERCOT?
研报英文原文证据摘录
US Power & Utilities: Watt’s Happening in ERCOT?
Accessible version
US Power & Utilities
Watt’s Happening in ERCOT?
Industry Overview
ERCOT requests adjustments to Long-Term Load Forecast 19 May 2026
The Electric Reliability Council of Texas (ERCOT) has filed a proposal with the Public Equity
Utility Commission of Texas (PUCT) to revise its long-term load forecast (Project No. United States
59772), with a decision expected at the June 18 Open Meeting. The filing effectively Utilities
acknowledges that ERCOT’s April outlook overstated demand, primarily due to overly Ross Fowler, CFA
aggressive assumptions around datacenter and crypto load realization. While the original Research Analyst
forecast projected peak demand of 278 GW by 2029 and 368 GW by 2032, ERCOT now BofAS+1 646 855 1506
highlights significant execution risk tied to project timelines, supply chain constraints, ross.fowler@bofa.com
and interconnection uncertainty. F. Paul Cole
Research Analyst
BofAS
+1 646 743 2122ERCOT proposal makes a smaller, but realer forecast
paul.cole2@bofa.com
To address this, ERCOT proposes two recalibration approaches: (1) a historical
Rinny Singh
realization framework, which would imply roughly a 45% reduction to the forecast, and Research Analyst
(2) the Batch Zero methodology, which focuses on validated, transmission-backed BofAS
+1 646 855 5729
projects. While Batch Zero figures will not be finalized until mid-August, they are also rinny.singh@bofa.com
expected to result in a meaningful reduction versus the prior forecast, and ERCOT has Nicolas Woods
explicitly indicated a preference for this approach given its stronger grounding in Research Analyst BofAS
executable infrastructure. Although the headline suggests a material downward revision +1 646 556 4179
本摘录由系统从所标注的 PDF 证据页直接提取并保留英文原文,不做批量翻译;登录后在阅读器切换中文时才按需翻译。
打开研报阅读器