Machinery, E&C and Waste: Day 2 Conference Takeaways
Construction Partners
Note that the following gives our interpretation of the key points highlighted in our investor
meetings and fireside chat. These conversations featured Greg Hoffman (Chief Financial
Officer and Chief Accounting Officer) and Rick Black (Investor Relations).
• Energy costs: ROAD emphasized that liquid asphalt is the primary energy-related
input, representing roughly ~7x the cost of diesel, and is structurally de-risked by
contract design, with most exposure effectively transferred to the states through
index-based pass-through mechanisms. On public work, ROAD is reimbursed or
clawed back based on the difference between the bid date and installation (i.e.,
when the asphalt is actually laid on the road) date index. Overall, around 80% of
total contract revenue is subject to mechanisms that allow for pass-through of key
cost movements. In addition, ROAD structurally sources liquid asphalt below the
index, embedding a margin advantage independent of price moves, while holding
~2-2.5 months of inventory (FIFO) that can further enhance margins in rising price
environments given typical winter procurement at lower prices, and benefits from
short project durations (6-9 months) that allow relatively rapid repricing of bids as
costs move. Diesel is a much smaller cost component, with ~50% hedged, limited
earnings sensitivity, and some ability to pass through hauling-related costs, while
natural gas remains stable vs pre Middle East conflict levels.
• Public and private demand: ROAD characterized demand as steady, recurring, and
geographically advantaged in the Sunbelt. Specifically, demand remains strong and
highly visible, with ROAD reporting robust bidding activity and backlog conversion,