U.S. COMPANY FILING
PETROBRAS - PETROLEO BRASILEIRO SA — Form 6-K filed 2026-05-01
Filing text preview
Petrobras announced the early start-up of the P-79 platform on May 1, 2026, ahead of schedule. Located in the pre-salt Santos Basin, it is the eighth platform in the Búzios field, with capacity of 180 thousand barrels of oil per day and 7.2 million cubic meters of gas compression per day, raising the field's total capacity to about 1.33 million barrels per day. The project connects to the Rota 3 pipeline, potentially expanding Brazil's gas supply by up to 3 million cubic meters per day. P-79 features a new hull design with emission-reduction technologies and includes 14 wells.
This preview uses text already stored in ReportGem and does not fetch the document from object storage during SEO generation. Review the internal filing record and the official SEC source before relying on it.
Open filing record