Evolution Mining: 4Q26 – Looking into FY27; Falling Production; Increasing Costs
Research evidence excerpt
Evolution Mining: 4Q26 – Looking into FY27; Falling Production; Increasing Costs
ted our
Adjusting on a like-for-like copper price, we see AISC increasing to $1,909-1,974/oz (JEFe model for 4QFY26 actuals. FY27 pre-
$1,732/oz on our FY27 Cu deck of US$6.35/lb Cu, versus the US$5.54/lb FY25 guidance). guidance resulted in changes to capex timing
and gold produced at Ernest Henry and
Ernest Henry & Cowal declines. Ernest Henry hoisting will run ~10% below capacity for
Cowal.
development catch-up post the weather event at ~5.8Mt UG ore mined through FY27, implying
gold production of ~61koz (vs VAe: 67koz). Cowal production is also expected to decline,
however acceleration of the OPC E46 and UG upside from the second portal limit this to Figure 1 - FY27 AISC Waterfall
<10% YoY, and better than JEFe. We model gold production of 283koz through FY27 (vs VAe:
275koz), still representing a 5% YoY decrease relative to FY26 production. We note that the
initial OPC tonnes are mostly oxide-cap, likely requiring blending to limit impacts to recovery.
Cowal and Ernest Henry for ~64% of JEFe asset-NPV.
Capital allocation and portfolio. Closing cash of $1,347m was broadly unchanged QoQ
as $374m of cash flow funded the $399m dividend. Liquidity remains ~$1.9b, including
the $525m undrawn facility to CY28, with EVN fully unhedged and no debt maturities until .Source: Company Reports, Jefferies
FY29. BS capacity supports sustaining investment and early-stage post-FY30 growth studies,
albeit diluting shareholder returns without associated ROI metrics for committed capital. The Figure 2 - FY26-27 Production Delta Bridge
dividend policy and potential for buybacks will be addressed with the FY26 result in August, we
model FY26 final DPS of 19c / -10% VAe; and FY27 DPS 55c / +31% vs VAe.