REAL-TIME GLOBAL RESEARCH
Diario | Latin America
Research evidence excerpt
Diario | Latin America
our ($1.14/lb) and consensus
($1.23/lb) estimates. Higher than expected cash costs mainly reflect higher input costs, including
increased prices for diesel, sulphuric acid and other key consumables across most of Anto's
operations, as well as the impact of a one-off labour settlement with the supervisors’ union at
Centinela during 2Q. 2Q provisional pricing adjustments for copper, gold and molybdenum for the
quarter were +$134.9m, -$18.1m and +$35.3m respectively.
2026 Cost Guidance Raised: 2026 production guidance for copper (650-700kt) and consolidated
capex guidance ($3.4bn ex-Zaldivar) remain unchanged. Copper production remains expected to
rise sequentially over the course of the year on rising throughput and grades at Los Pelambres
and Centinela. Net cash cost guidance of $1.15-1.35/lb remains unchanged. However, guidance
for cash costs pre-byproducts has been raised ~4% to $2.40-2.60/lb (from $2.30-2.50/lb) as prices
for fuel and key consumables have remained elevated.
Major Projects Advancing: Key growth projects remain on track for commissioning in 2027. At
Centinela's Second Concentrator, the quarter saw completion of ball mill internal linings and the
fines stockpile dome, alongside pre-commissioning of the primary crusher motor and overland
conveyor drives. At Los Pelambres, progress continued on the concentrate pipeline. The Zaldívar
water supply project was approved in 2Q, a c.$0.9bn investment (100% basis) to build a pipeline
and pumping system using reprocessed wastewater from Antofagasta city, allowing the mine to
move off continental water from mid-2028 and potentially extending life-of-mine to 2051.
Our Call: On our estimates, which do not yet include 2Q26 production results, Anto trades at a
The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.
Open report viewer