ReportGem ReportGem 中文

REAL-TIME GLOBAL RESEARCH

Global I/O Smartphones: UBS Evidence Lab Inside 2Q26 Smartphone Survey: Softening, but not cratering

Published: 2026-07-01Institution: UBS EquitiesPages: 28Original language: EnglishEvidence page: 1

Research evidence excerpt

Global I/O Smartphones: UBS Evidence Lab Inside 2Q26 Smartphone Survey: Softening, but not cratering

Powered by Lab Global1 JulyResearch2026ab Evidence UBS YES

Global I/O Equities

GlobalSmartphones

Semiconductors

UBS Evidence Lab Inside 2Q26 Smartphone

Nicolas Gaudois

Survey: Softening, but not cratering Analyst

nicolas.gaudois@ubs.com

+65-6495 5148

David Vogt

Replacement cycle has started to lengthen

Analyst

On the back of memory semis supply shortages as well increasing pricing, smartphone david.vogt@ubs.com

unit Sell In remains soft. Sell Through units are down 7% YoY YTD through May (source: +1-212-713 4296

Counterpoint). Wave 23 (2Q26) of our UBS Evidence Lab Smartphone Survey (> Access Randy Abrams

Dataset) indicates 12-month purchasing intent of 36% of total respondents, down HoH Analyst

and flat YoY (from 40%/36% in 4Q25/2Q25). We note that, after initial production cuts randy.abrams@ubs.com

on the Android side (vs. stable to up for iPhones) in 1Q26, smartphone suppliers have +886-2-8722 7338

largely seen stable trends at a rebased down level. Still, further device price increases Timothy Arcuri

could trigger some lengthening of the replacement cycle. Only 24% of respondents Analyst

indicated being ready to pay >10% more for their next smartphone. We already note timothy.arcuri@ubs.com

that the expected time for smartphone replacement out of our respondents' sample has +1-415-352 5676

lengthened to 30.8 months from 29.6 in 4Q25. All in all, we maintain our forecast for Jimmy Yoon

smartphone industry unit Sell In at 1.14bn or -10% YoY for 2026, and 1.16bn or +2% Analyst

YoY in 2027. jimmy.yoon@ubs.com

+65-6495 4617

Memory costs continue to go higher Sunny Lin

We now estimate memory to account for 40% of the bill of material (BOM) costs of Analyst

The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.

Open report viewer