LRCAP and improvement in reservoirs in the South should postpone red flag Analyst
According to Agencia Infra, the contracting of thermoelectric plants in the LRCAP giuliano.ajeje@ubs.com
(Reserve Capacity Auction in the form of Power) to start operating in 2026, along +55-11-2767 6371
with the improvement of reservoirs in the South region, should postpone – or even Henrique Simoes
avoid – the activation of the red flag this year. These two factors helped to maintain Associate Analyst
the level in yellow this June and tend to relieve the pressure on the flags for the henrique.simoes@ubs.com
remaining months of drought, they assess. (link) +55-11-2767 6308
Julia Ongarato
Taesa anticipates line between SP and PR, and adds R$44.5mn to RAP Associate Analyst
According to MegaWhat, Taesa received from the National Electric System Operator julia.ongarato@ubs.com
+55-11-2767 6694
(ONS) the Release Terms related to the energization of the 525 kV Bateias – Curitiba
Leste C1 and C2 transmission line, in the Ananaí Transmissora de Energia Elétrica
concession, 100% controlled by Taesa. With this energization, Ananaí will add to its
annual permitted revenue (RAP) the approximate amount of R$44.5mn (referring to
the 2025-2026 cycle), equivalent to 26.0% of the total RAP of the concession, with
retroactive effect to May 26, 2026. (link)
Cemig pays R$155mn for DG plants in Potenza
According to MegaWhat, Cemig Sim announced the acquisition of the entire capital
stock of three Special Purpose Companies with 11 photovoltaic distributed
generation plants with an installed capacity of 26.2 MWp. The acquisition price was
R$155mn.