ReportGem ReportGem 中文

GLOBAL RESEARCH ARCHIVE

Jubilant Foodworks Ltd Measured outlook amid rising costs; SSSG recovery pace key monitorable

Published: 2026-05-20Institution: JPMorganCompany / ticker: JUBI.NSPages: 13Original language: 英语Evidence page: 1

Research evidence excerpt

Jubilant Foodworks Ltd Measured outlook amid rising costs; SSSG recovery pace key monitorable

J P M O R G A N Asia Pacific Equity Research

21 May 2026

Jubilant Foodworks Ltd Neutral

JUBI.NS, JUBI IN

Measured outlook amid rising costs; SSSG recovery Price (20 May 26):Rs472.55

pace key monitorable ▼Price Target (Mar-27):Rs474.00 Prior (Mar-27):Rs480.00

JUBI’s Q4 pre-INDAS EBITDA growth was modest at +5% y/y, weighed down by

higher rental expenses and soft revenue growth (+5% y/y; LFL +0.2%) despite better- Consumer, Retail, Media

than-expected gross margin delivery (+100bp y/y). On the earnings call, management Latika Chopra, CFA AC

narrative was measured amidst rising inflationary headwinds, though noting Q1 is (91-22) 6157-3584

tracking better (price hike of 1.2%) and reiterating its 5-7% LFL growth target over latika.chopra@jpmorgan.com

the medium term. Store addition pace remained healthy (Domino’s: +61/+276 in Q4/ Himanshu Singh

FY26) and the company targets ~300 store adds this year in India (Dominos + (91-22) 6157-3610

himanshu.x6.singh@jpmorgan.com

Popeyes). JUBI noted near-term headwinds for operating margin on account of

Saransh S Gokhale

increased energy expense (~120 bps), wage hikes (50-60 bps from minimum wage

(91-22) 6157 3578

revisions across 11+ states and labor code), and emerging commodity inflation saransh.gokhale@jpmchase.com

(cheese, oil, packaging) - partially mitigated by efficiency and productivity measures J.P. Morgan India Private Limited, J.P. Morgan

including calibrated pricing (~1.2% taken), wastage reduction, and supply chain Tower,Registration:Santacruz(E),INH000001873,Mumbai (91-22)- 400098,6157-3000.SEBI

optimization. The standalone margin expansion target of ~200bps is now expected to

be delivered over time (vs FY28 earlier).

The English excerpt is extracted automatically from the cited source page and may contain layout or recognition errors. It is never batch translated.

Open report viewer